Some of the physical installation issues that need to be factored into the
design involve cable runs from the antenna system, each leg, to the base
station equipment. Although this may seem an obvious point, often there
are situations where the desired routing of the cables is not practical, making
the real installation length much longer than desired. The additional
cable run length, when installation reality is factored in, may have made
the site nondesirable; however, if this situation occurs too far down the
stream of the construction process, it is too late to reject the site or make the
appropriate design alterations to correct the situation.
145 times read

Related news

No matching news for this article
Did you enjoy this article?
(total 0 votes)

comment Comments (0 posted) 

More Top News
CCSP-Cisco Certified Security Professional
Most Popular
Most Commented
Featured Author