Communication-Site Check List
Table 14-2 is a brief summary of the major items that need to be checked prior to or during the commissioning of a communication site. The check list that follows is generic and should be tailored for your particular application, that is, add or remove parts where applicable. However, the list that follows is an excellent first step in ensuring that everything is accounted for prior to the communication site going commercial.
Site-Location Issues: 1) 24-Hour Access 2) Parking 3) Direction to site 4) Keys issued 5) Entry/Access Rerstrictions 6) Elevator Operation Hours 7) Copy of Lease 8) Copy of Building permits 9) Obtainment of Lean Releases 10) Certificate of Occupancy Utilities 1) Separate Meter Installed 2) Auxillary Power (generator) 3) Rectifiers Installed and Balanced 4) Batteries Installed 5) Batteries charged 6) Safety Gear Installed 7) Fan/Venting supplied Facilities 1) Copper or Fiber 2) Power for fiber hookup (if applicable) 3) POTS lines for Operations 4) Number of facilities identified by Engineering 5) Spans shacked and baked HVAC 1) Installation Completed 2) HVAC tested 3) HVAC system accepted Antenna System 1) FAA Requirements met 2) Antennas Mounted correctly 3) Antenna Azimuth checked 4) Antenna plumbness check 5) Antenna inclination verified 6) SWR Check of antenna system 7) SWR record given to Ops and Engineering 8) Feedline connections sealed 9) Feedline grounds completed Operations 1) User Alarms defined Engineering 1) Site Parameters Defined 2) Interference check completed 3) Installation MOP generated 4) FCC requirements document filled out 5) Drive Test complete 6) Optimization complete 7) Performance Package completed Radio Infrastructure 1) Bays Installed 2) Equipment installed according to plans 3) Rx and Tx filters tested 4) Radio Equipment ATP’d 5) Tx output measured and correct 6) Grounding complete
316 times read
|
Related news
|
| No matching news for this article |
|
Did you enjoy this article?
(total 0 votes)
|