Header
Home | Set as homepage | Add to favorites
  Search the Site     » Advanced Search
Sections
Syndication


Blogroll:

||||| ALL Cisco-Network ARTICLES |||||  
CCIE Journey,
The CCIE Journey,


Link Budget

Jan 05,2011 by alperen

image


The Link Budget calculations directly influence the performance of the
CDMA system since it is used to determine power settings and capacity
limits for the network. Proper selection of the variables that comprise the
link budget is a very obvious issue.
Two links are used: forward and reverse. The forward and reverse links
utilize different coding and modulation formats. The first step in the link
budget process is to determine the forward and the reverse links’ maximum
path losses. The forward links’ maximum path loss is determined using
Table 3-9a.
The data gathered shows that the maximum path loss sustainable is
about 159.6 dB using the parameters selected. The reverse link calculations
are shown in Table 3-9b.
The maximum path loss that is sustainable in the reverse direction is
139.dB, which shows that the base station is reverse link limited for the
parameters inputted into the link budget.
198 times read

Related news

No matching news for this article
Did you enjoy this article?
(total 0 votes)

comment Comments (0 posted) 

More Top News
CCSP-Cisco Certified Security Professional
Most Popular
Most Commented
Featured Author