Site Acceptance (SA)
Once a site has been tested for its potential use in the network, it is determined to either be acceptable or not acceptable. For this section, the assumption will be that the site is acceptable for use by the RF Engineering department as a communication facility. It is imperative that the desires of the RF Engineering department be properly communicated to all the departments within the company in a timely fashion. The method of communication can be done verbally at first, based on time constraints, but a level of documentation must follow that will ensure that the design objectives are properly communicated. The forms outlined later in the chapter are meant to be general guides and might need to be modified based on your particular requirements. Before the site acceptance (SA) is released, it is imperative that it go through the design review process to ensure that nothing is overlooked. The SA will be used to communicate the RF Engineering department’s intention for the site and will be a key source document used by Real Estate, Construction, Operations, and the various subgroups within the Engineering department itself. The SA will also need to be given a document control number to ensure that changes in personnel during the project are as transparent as possible.
214 times read
|
Related news
|
| No matching news for this article |
|
Did you enjoy this article?
(total 0 votes)
|