Header
Home | Set as homepage | Add to favorites
  Search the Site     » Advanced Search
Sections
Syndication


Blogroll:

||||| ALL Cisco-Network ARTICLES |||||  
CCIE Journey,
The CCIE Journey,


MLS Procedures

Dec 16,2008 by alperen

image

MLS Procedures
We discussed the three required components of MLS. It is important to understand how they work
together to enable layer 3 switching. Let’s look at a sample network topology that supports MLS.
Figure 18.2 shows a simple architecture of a router and a switch with two connected hosts
on the switch. Again, the hosts have different VLAN assignments, requiring the router’s intervention
to route packets. Notice that the figure depicts the main interface with two subinterfaces:
FE0/0.2 and FE0/0.3. As it stands, the current topology requires that all packets sent from
the client on VLAN 3 to the client on VLAN 2 be routed by the external router. If there are a
large number of packets, this creates a lot of unnecessary work.
127 times read

Related news

» Understanding the Fundamentals of MLS
by alperen posted on Dec 16,2008
» VLAN Assignments
by alperen posted on Dec 16,2008
» Router-on-a-stick diagram
by alperen posted on Dec 16,2008
» An Internal Route Processor
by alperen posted on Dec 14,2008
» Inter-VLAN Routing THE CCNP EXAM TOPICS COVERED IN THIS
by alperen posted on Dec 14,2008
Did you enjoy this article?
(total 0 votes)

comment Comments (0 posted) 

More Top News
CCSP-Cisco Certified Security Professional
Most Popular
Most Commented
Featured Author